{"id":5708,"date":"2020-07-24T11:45:06","date_gmt":"2020-07-24T08:45:06","guid":{"rendered":"https:\/\/em4c.gr\/?page_id=5708"},"modified":"2020-07-24T11:47:01","modified_gmt":"2020-07-24T08:47:01","slug":"repairing-the-detachment-of-masonry-on-both-sides","status":"publish","type":"page","link":"https:\/\/em4c.gr\/en\/repairing-the-detachment-of-masonry-on-both-sides\/","title":{"rendered":"Repairing the detachment of masonry on both sides"},"content":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]1. Remove the old coating over 25cm in height and 25cm below the detachment.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2965 aligncenter\" src=\"http:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1-300x300.png\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1-300x301.png 300w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1-100x100.png 100w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1-150x150.png 150w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1-45x45.png 45w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/1.png 505w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>Fig 1<\/strong>: Removal of coating<\/p>\n<ol start=\"2\">\n<li style=\"text-align: justify;\">Washing the area with water, under low pressure, taking care that the surface remains wet until the application of mortar.<\/li>\n<li style=\"text-align: justify;\">Open holes with diameter, about 14mm, in about 1m distance, starting from the ends of the interface between beam-masonry.<\/li>\n<li style=\"text-align: justify;\">Placing small (temporary) metal inserts (diameter D10 or D12) in the holes.<\/li>\n<li style=\"text-align: justify;\">Application of <strong>INTOSANA<\/strong> mortar <strong>by AZICHEM<\/strong> inside the detachment area, using small trowel.<\/li>\n<li style=\"text-align: justify;\">Apply first coat of mortar <strong>INTOSANA<\/strong> on a thickness of about 6mm and in widths of 25cm above and below the holes. Then install over the area a 50cm strip of fiberglass <strong>GT AR by<\/strong> <strong>BIEMME<\/strong>, with particular attention to the points of contact with the metal inserts.<\/li>\n<\/ol>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2964 aligncenter\" src=\"http:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/2-300x237.png\" alt=\"\" width=\"300\" height=\"237\" srcset=\"https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/2-300x237.png 300w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/2.png 582w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2963 aligncenter\" src=\"http:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/3-300x212.png\" alt=\"\" width=\"300\" height=\"212\" srcset=\"https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/3-300x212.png 300w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/3.png 543w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>Fig 2,3<\/strong>: Installation of metal inserts and application of the first layer of mortar and fiberglass<\/p>\n<p style=\"text-align: justify;\">7.Removal of metal inserts and fitting of &#8216;cord&#8217; of special fiberglass <strong>FGC<\/strong>, diameter of 1cm, impregnated with epoxy resin <strong>ARMOFIX MTX by DRACO<\/strong>. The string is inserted 10cm into the hole and the remaining 10 cm, it is opened formatting an open circle that is glued with epoxy resin <strong>ARMOFIX MTX by DRACO<\/strong> on the mortar.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2962 aligncenter\" src=\"http:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/4-200x300.png\" alt=\"\" width=\"200\" height=\"300\" srcset=\"https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/4-200x300.png 200w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/4-300x449.png 300w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/4.png 334w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-2961 aligncenter\" src=\"http:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/5-300x277.png\" alt=\"\" width=\"300\" height=\"277\" srcset=\"https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/5-300x277.png 300w, https:\/\/em4c.gr\/wp-content\/uploads\/2020\/03\/5.png 530w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>[\/vc_column_text][vc_column_text]<\/p>\n<p style=\"text-align: center;\"><strong>Fig 4,5<\/strong>: Installation of fiberglass cords<\/p>\n<ol start=\"8\">\n<li style=\"text-align: justify;\">Over the cord and the area apply an extra layer of mortar <strong>CALCE STORICA by DIASEN<\/strong> of about 6mm thickness, to fully cover the entire surface of the 50cm width.<\/li>\n<\/ol>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]1. Remove the old coating over 25cm in height and 25cm below the detachment. [\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/6&#8243;][\/vc_column][\/vc_row][vc_row][vc_column width=&#8221;1\/6&#8243;][\/vc_column][vc_column width=&#8221;2\/3&#8243;][vc_column_text]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-5708","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/pages\/5708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/comments?post=5708"}],"version-history":[{"count":4,"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/pages\/5708\/revisions"}],"predecessor-version":[{"id":5712,"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/pages\/5708\/revisions\/5712"}],"wp:attachment":[{"href":"https:\/\/em4c.gr\/en\/wp-json\/wp\/v2\/media?parent=5708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}